Final case part is back from the machine shop, look okay when assembled. Just the stands to produce now.


Successfully mounted the switches and I’m happy with the placement and the look of the them on the rear of the unit. With near enough all the
electrics mounted all is, waiting for now are some short USB cables to arrive from my eBay shop in Hong Kong. This is for two reasons. Firstly,
the current wires plugs on the Revburners collide with the switches, so elbowed plugs will be on the new cables. The 12v DC power plug elbows
have already arrived as seen in the photo below. Secondly, I want to reduce the length of the cables so they hold bettering the cluster case.
I also want to reduce the amount of wires that come out of the cluster so I intend to join the 4 new short USB cables from the two Revburners,
the GI-Max Gear indicator and the SPI-D digital speedometer together with the hub in the photo below so only one USB cable adorns from the
cluster. I want to experiment with the DC power cables too to see if I can join the two together so I only have one Power cable coming out of
the case.